Introducing a new feature: depth-based cost variable for drilling
Contact usPLANS is introducing a new variable for cost items, which is depth-based. This means that costs can now be calculated based on the depth of a specific element within the project, reflecting the additional factors associated with varying depths.
Predefined Label Collection
We have introduced a predefined label collection feature to better organize and manage different labels within settings. This collection can be used for any cost or time level, and is compatible with any settings version. This enhancement allows for more streamlined and consistent labeling across different projects and settings configurations.
Improved Allocation of Project Risk and Cost
PLANS now offers improved mechanisms for allocating project risk and cost, ensuring more accurate and efficient management:
- Redesigned Model Structure Overview
The overview of the model structure has been relocated to a more convenient position on the right side panel. This update provides a clearer and more organized view of the model, enhancing usability and workflow efficiency
- New Search Functionality
A powerful new search feature allows users to quickly locate the exact location within the model to assign or allocate project risk or cost, streamlining the process and reducing errors