4
min read

Improving efficiency in the Ivar Aasen field development through lessons learned capture

Illustration of an offshore oil and gas field and digital workflows for capturing lessons learned.
Published on
November 6, 2018

Stay informed

By subscribing you agree to with our Privacy Policy.
Thanks for reaching out!

Oops! Something went wrong while submitting the form.

The challenge

Huge amounts of oil data are being created and captured throughout the petroleum asset life. While there has been an exceptional evolution in developing software technologies for digitalising and standardising upstream data, the oil and gas industry still struggles with finding solutions that would encourage the best re-use of the historical reservoir data and drilling knowledge. A lot of valuable well engineering time is spent on searching for data and managing knowledge transfer in spreadsheets.

Why are spreadsheets less effective than digital data platforms in knowledge transfer

  • Oil field development faced inefficiencies due to lessons learned data scattered across spreadsheets
  • Experiences search difficult and time consuming due to limited filtering
  • Experiences not detailed enough due to limited space and limited option for adding attachment
  • Challenging to manage QC process

How did iQx Experiences improve collaboration and knowledge sharing in Ivar Aasen field development?

  • Cloud-based database accessible to multidisciplinary teams any time from any place.
  • Advanced filtering giving direct access to relevant experiences
  • Advanced filtering and QC/QA functions improved retrieval of relevant experiences.
  • Easy export to PDF for direct insert into EOW report
  • Enhanced search based on wellbore, location and drilling unit

Please contact our team here.

Abstract blurred background with swirling blue and green light streaks.

Read Similar Success Stories

Discover more success stories from operators who use iQx™ to improve efficiency, reduce uncertainty, and modernize their well planning workflows.

5
min read

A leading Operator in Malaysia transforms well time & cost management

iQx PLANS delivers measurable outcomes marked by greater efficiency, improved collaboration, and data-driven decision-making.
drillship-black-rhino-apus-energy-guinea-bissau
5
min read

Driving AFE confidence for frontier exploration drilling in Guinea-Bissau

iQx PLANS streamlines well planning and reducses cost uncertainty in West Africa frontier drilling.
6
min read

Increasing efficiency for D&W performance teams at a Norwegian operator

Aker BP implements PLANS application at their D&W Improvement and Performance team and uses Yggdrasil 55 well campaign as pilot for forecasting time & cost.

YOUR iQx JOURNEY

Get Your Demo

Put us to the test. Share your next drilling challenge, and we’ll model time and cost with you.